PHARMACAL FACTORY

Yuen Long | Hong Kong    Industrial    26.000 sqm    Private Commission    Under construction

The project consisted two industrial buildings to be renovated and two new to be built. Once all the drawings were prepared for the Tender stage to chose a contractor the client decided to build a BIM model LOD350 in ARCHICAD to generate a Clash detection in between the Architecture, Structure and MEP disciplines.

Due to the huge amount on inconsistencies in between disciplines the coordination was very complex. The amount of clashes were huge and the client had the chance to have a more clear understanding of the problems of the project. The model was handed to the contractor to redraw the documentation for a successful construction.